Basic- and Detail-Engineering

The terms basic- and detail‑engineering refer to stages of the execution process of a plant building project from which, based on the process concept, the documents result that are required for the procurement of the components of the plant as well as for the creation of the plant control system. Part of the process engineering tasks during basic- and detail‑engineering are additionally the creation and maintenance of the piping and instrumentation diagram.

Image of a PID.

Piping and Instrumentation Diagram

The piping and instrumentation diagram is usually the leading document of a plant building project and numerous procedures of the execution process are being aligned with its content. Requirements and components that are newly added as well as adjustments on the existing structure of the plant are first represented on the piping and instrumentation diagram.

Image of an arrow.More
Image of a pump.

Sizing of Components

...

Image of an arrow.More
Visualization of a technical specification.

Technical Specifications

Technical specifications are created for the plant components during the execution process of a plant building project. They are based on the outcome of the sizing and contain the data required by the suppliers to align the capacity and the design of the components with the requirements of the plant.

Image of an arrow.More
Image of an FDS operation.

Functional Design Specifications

The functional design specifications form the basis for the programming of the process control system. Based on the process concept, they describe the calculation steps required to continuously determine the operating behaviour of the single components of the plant using the process values recorded in the process control system. They furthermore describe the signal exchange between the process control system and the components as required for controlling the latter ones.

Image of an arrow.More
Image of tools and a button.

Operating Manual

The creation of the operating manual belongs to the last of the procedures occurring during the basic- and detail‑engineering and considers all of the requirements defined in the previous steps for the plant operation. Depending on the course of the commissioning, later adjustments on the operating manual might be necessary.

Image of an arrow.More